Building A Sustainable Apartment // Part 2

Step 2 in building our own sustainable apartment was digging a ginormous hole. A hole large enough to create our own private entry and garden terraces. The Mr., along with Jackson the wheelbarrow and a shovel, spent two months digging and hauling and sweating and digging just a little more. Don’t you worry. I got my little hands dirty and blistered too.

part 2 1

The Quality Control Manager had to do a progress check walk through.

part 2 2

Another quality control inspection. (This guy is tough!)

part 2 3

part 2 4

part 2 5

part 2 6

part 2 7

part 2 8

part 2 9

part 2 10

(This post was originally published on our sticks or stones blog, which is no longer in publication.)

Advertisements

One thought on “Building A Sustainable Apartment // Part 2

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s